HOME | POLICIES | FAQ | CONTACT  
Program on Negotiation Clearinghouse
Your cart is empty

Resources
Sign In
Returning users may sign in. Registering with the Clearinghouse offers several benefits, including:
  • Save your customer information for quicker shopping.
  • View your order history.
Fishladder Claim
ROLE SIMULATIONS
Fishladder Claim

Susan Podziba and Lawrence Susskind
 
 
Per participant (Non-Profit/educational)$3.00
Per participant (For Profit)$4.00
Teacher's Package (Download Below)$0.00
Soft copyHard copyWhat to Order?

Download a review copy

Be the first to write a review

SCENARIO:

The U.S. Agency of Engineers (Agency) contracted with Concrete Construction Company (CCC) to redesign and reshape the cement weirs of the west fishladder of the Arctic Lock and Dam. The cement work has to be done during harsh winter conditions because the fishladder is in use at all other times. Three bulkhead gates at the upstream entrance to the fishladder were expected to keep the work area virtually dry.

According to the contract, CCC was required to lower the bulkhead gates into their sealed position to assure that water did not flow into the fishladder and affect concrete placement areas. CCC failed to obtain a water-tight seal on one of the bulkhead gates and was plagued by water throughout the project.

After the contract work was completed by CCC and accepted by the government, the contractor filed a claim at the Federal Contract Appeals Court based on the bulkhead gates' failure to provide a water-tight seal. CCC charges that according to the contract CCC had to "lower the gates in the sealed position." CCC contended that it did so under the direction of Agency personnel. CCC claims that the Government's property (i.e. the gates) malfunctioned due to insufficient maintenance and age. For these reasons, CCC charges that the government is liable for the delays and increased costs that resulted from unexpected water and ice in the cement placement area.

MAJOR LESSONS:

  • This exercise provides a useful context for thinking about the preparation required for ADR, knowing your BATNA, and for estimating the strength and weaknesses of your negotiation position.

  • When the intra-group negotiation is conducted by two or more groups simultaneously, the comparison of different outcomes and dynamics can be observed.

    MECHANICS:

    Preparation should take 30-45 minutes, as should the actual negotiation. Debriefing should take 45-75 minutes.

    TEACHING MATERIALS:

    For all parties:  

  • General Instructions 
  • Steps in non-binding Arbitration Process 
  • Memo to the Chief of Construction and the District Engineer from the Chief District Counsel

    Role specific:
    Confidential and Supplemental Instructions for
  • Chief of Construction    
  • Chief District Counsel    
  • District Engineer

    Teacher's Package:   
  • All of the above 
  • Teaching Note

    THEMES:

    ADR; Contracts; Construction; Intra-team negotiation; Meeting design; Negligence; Preparation; Joint gains; Litigation analysis; Information exchange; Interest analysis; Objective criteria; Options, generating; Systems of negotiation

  • Time required1-2 hours
    Number of participants3
    Teams involvedNo
    Agent presentNone
    Neutral third party presentNone
    ScoreableNo
    Teaching notes availableYes
    To search for other role simulations by attributes, use our role simulation advanced search tool.
    Search

    ADVANCED SEARCH >>
    Topics
    Arbitration

    Business

    Community

    Consumer

    Education

    Environment

    Ethics

    Facilitation

    Family

    Government

    High School/Young Adult

    International

    Intra-organizational

    Law

    Mediation

    Medicine/Health

    Multidisciplinary

    Pedagogy

    Prisoner's Dilemma / Game Theory

    Psychology

    Public Disputes

    Technology

    Reviews

    Current Reviews: 0
    Write a Review
    PRIVACY POLICY Phone: 800-258-4406 (from within the U.S.) or 781-239-1111 (from outside the U.S.)
    E-mail: chouse@law.harvard.edu
    Copyright © 2004 The President and Fellows of Harvard College